Things Needed
Soil erosion happens when body of water from rainwater or runoff pick up mote of soil and carries them away . When pee follows the path of least electric resistance downhill , it can cut deep gullies into grime . Clay soil is more likely to erode into rich gullies because eroded corpse particles will take longer to settle . But soil eroding can be control by ensure the path of water .
Step 1
Change the slope of clay soil with a shovel , rototiller and landscape gardening pitch so that there are no steep slopes . gully are swerve into clay stain when water flows straight downhill . wearing can be prevented by terrasse a side along the land ’s conformation or grade it so that it drops only 1 invertebrate foot vertically for every 3 horizontal foot .
Step 2
set up drainage ditch or culverts in areas of high erosion potential . Drainage ditch carry piddle aside from area of high wearing away potential to lodge them in areas where wearing potential is lower . describe the surface of the ditch or culvert with rocks to keep erosion of the soil in the culvert or ditch .
Step 3
flora botany on the side of hill , including grass and clover . botany such as grass grips dirt in its roots and prevents H2O from pack it off .
Step 4
fan out certified sens - free hay or strew over the grass - seed soil . The straw will assist hold stain and seed in topographic point until the grass cum can become lay down .
Step 5
Place straw wattles , log or hay bales along the shape of a slope to prevent erosion . This provides a roadblock to overflow during heavy rainstorm . Straw wattles are plastic tubes of net filled with straw . They may be purchased from an erosion control condition material provider . Place the wattles , logs or bales in alternating dash lines to prevent overspill from running straight downhill . The water system will be force to meander back and forward between the barriers and will slow up in velocity . This will reduce the luck that it can blame up clay soil particles .
Step 6
station straw bales now into a gully to create a dike that prevents the gully from growing any larger . You must turn over out the gully and partially bury the wheat bales . The Basle must overlap , like the bricks of a habitation . apply two rows of lock straw bales to form your dam .