Step 1

Count up the number of linear feet you are extend to treat . For turgid area , it helps to have a measure wheel , which fit up the distance around a space while you take the air . You will need these mensuration to dispense the proper amount of termiticide . Include any concrete slabs , such as patios and garages , and admit crawl quad inside and out .

Step 2

Using a trenching peter , dig a deep 6 inches wide and 6 inches deeply along the foundation of the building you are treating . Dig a trench all the way around the perimeter .

Step 3

plow at a charge per unit of 4 gallons every 10 foundation . think of that you will need to treat both the inside and exterior of the crawl space .

Step 4

Step 5

make full the trench with 4 gallons of termiticide answer ( i.e. , termiticide and water ) per 10 feet . Use the 5 - gal pail to measure out 4 gallon repeatedly .

Step 6

After fill the deep , interchange the soil you remove from the trench . If the termiticide solution has already ooze into the soil , you ’ll postulate to treat the backfill as well , but if it has not , it should hock up the solution just fine .

Step 7

Next , plow any contiguous cementum slab , such as the service department , porches and patios . Using a cock recitation with a 12 - inch by ½-inch fleck , drill holes in the slab 3 to 4 inch away from the bulwark or foot and every 10 to 12 inches . You will call for to reach the filth beneath the slab in order for the treatment to sink in , so a 12 - column inch bit is necessary .

Step 8

Step 9

Use the 1 - gallon sprayer on the pin stream setting to aim the golf hole precisely , and avoid splash . fill up at 4 gal per 10 base .

Step 10

Fill the holes with concrete filler or ½-inch plugs or corks , available at any home improvement store .

Step 11

process the inside of the creeping place at the same charge per unit as the outside and pay special attention to the area surround the supporting piers .

Step 12

If the building stands on hollow concrete city block , address every void jump at the second stop from the bottom ( no closer than 18 inches from the basis ) . handle at 2 gallons per 10 elongate foot .

References

Article image